Details
This project is part of the Vista Canyon Development on the SCRRA ( Southern California Regional Rail Authority) Valley Subdivision. The construction includes; approximately 3,500 Ft New Railroad Track in Five(5) Phases, a Grade separated , ADA complaint Center Platform with Pre-fabricated Canopies, Customer Information Systems, Communication Shelter, Mini High-Loading Platform , Landscaping and Station Entrance Improvements.The Scope of Work includes but not limited to Installing a new Control Point Humphreys Turnout, Building a Second Track, New Railroad Bridge, Soil Nail Wall, Sound Wall and Retaining Wall, Replacing or Extending Utility Protection, Grading, Track and Surface Drainage, Fill, Rehabilitating and Lifting Existing Track, and supporting Metrolink Signal.