Gold Coast Transit

Transporation / Airport

With our project at the Gold Coast Transit Administration and Operation Facility, Icon West has constructed over 50,000 sq. ft. of new buildings.

Size
+ 50,000 sq. ft.
Year
2018
Location
Oxnard, CA
Leed
Certified
Client
Gold Coast Transit

Details

The buildings built at this job site are: an administration building, a state-of-the-art 8-bay maintenance and repair building, a modern compressed natural gas fuel station, and a unique environmentally safe bus wash. Additionally, Icon West constructed 170,000 sq. ft. of 10-inch thick reinforced concrete paving and over 90,000 sq. ft. of asphalt paving on the 15 acre site.

Transporting Ventura County

Noted as the largest infrastructure project in the last decade, Icon West’s project at the Gold Coast Transit District will allow GCTD to become the largest provider of public transit with a site designed to maintain a fleet of up to 125 buses.

Environmentally Friendly

This project meets all CalGreen requirements and is expected to be a leader in energy and environmental design.

Metro Blue Line Rail Restoration